Our Work

  • Pharmavite San Fernando Micro Lab

      -  Laboratories

    The project including remodeling of the Microbiology Lab and allied spaces like tool storage room & glassware washroom. Scope included the installation of a vertical carousel for storing all tool room’s tooling, electrical and mechanical upgrades to the system.

  • Caltech Dabney Hall Basement Renovation

      -  New Construction / Renovations

    Caltech commissioned the Wesely Thomas Design/Build team to convert a portion of the library space in the Dabney Hall building into Post Doctorate and student office spaces for the Humanities and Social Sciences division (HSS). The project comprises approximately 3,180 square feet and our goal

  • PepsiCo Kevita Elevar

      -  Manufacturing

    The project scope consisted of a new pH Neutralization system installed in a new pH Shed building located alongside the existing building in the parking area lot and a new interior building Lift Station pump room located inside the plant.
    The new pH Neutralization system skid and storage

  • Caltech Tissot Laboratory

      -  Laboratories

    Lab space renovated for a trace metal cleanroom suite and a separate dedicated area for mass spectrometers. The project includes a class-1000 cleanroom utilizing corrosive-free equipment and materials due to research procedures involving perchloric acids; and also includes specialized mechanical

  • Caltech Bucholz Laboratory

      -  Laboratories

    Remodel of a historic lab in the Arms Building for geologic research for Professor Claire Bucholz. The scope of the project included demolition, new laboratory casework, mechanical, electrical, and plumbing, laboratory hoods, and specialized equipment for the Professor unique sample analyzation

Pages